Draw schedule plot as in GUI
Related to #157 (closed)
Now, the operations are drawn from top to bottom based on start times. There is also some initial support to store the y-location for the operation, although it is currently overwritten at the start of drawing.
Merge request reports
Activity
Please register or sign in to reply