Reorder operations in scheduler
Restart from top with current schedule.
Also possible to drag in y-direction and "insert" operation between two operations leading to that the operations above/below are reordered.
Probably a first step is to introduce a high-level y-position for each operation. This should then be saved in the schedule and fed back to the figure generation.
One may also consider allowing multiple operations on the same line.